A- A A+ Switch to Dark Theme English

सीधे मुखपृष्ठ पर जाएं एक्सेसिबिलिटी हेल्प

अवसंरचना एवं सिविल प्रभाग

1 / 10
2 / 10
3 / 10
NHAI PROJECT, GUWAHATI

Location Guwahati to Sonapur, Assam
Client NHAI, New Delhi
Cost of Project Rs 245 Cr.
Scope of work Widening and strengthening of existing National Highway from two lane to four lane (km 163.895 to km183.000) of Guwahati to Sonapur section of NH-37 in Assam on East-West corridor.
Length 20.00 Kms
Road Project Image
4 / 10
NHAI PROJECT, GUWAHATI

Location Guwahati, Assam
Client NHAI, New Delhi
Scope of work 14 Kms invlovled services roads, widening of Roads, drainage and one new flyover.
Cost of Project Rs 34.00 Cr.
Length 14.00 Kms
Road Project Image
5 / 10
BORDER ROADS, UTTARAKHAND

Location Dharasu -Gangotri, Uttarakhand
Client Border Road Organization
Scope of work Widening/Improvement of Dharasu -Gangotri Road (NH108) from Km 0.00 to Km 13.00 (Net length 13.00 Kms) to NHDL Specification in the area of 36 BRTF/1442 BCC under project Shivalik in Uttarakhand State. Approximately 3200 meters above the sea level.
Cost of Project Rs 34.96 Cr.
Length 13.00 Kms
Road Project Image
6 / 10
LAKHNADONE-GHANSORE (BOT), M.P. (TLTRL)

Location Lakhnadone-Ghansore upto Seoni Border, Madhya Pradesh
Client MPRDC
Scope of work Lakhnadone-Ghansore Two-lane road upto Seoni Border is a segment of SH-40 situated in Madhya Pradesh State having total length of 38.00 Km. The project Road for widening and upgrading of existing road starts form Km. 0.00 at NH-7 Junction (PWD Ch.544/5) in Lakhnadon Village and terminates at Km. 38.00 in Ghansor Village.
Cost of Project Rs 92.00 Cr.
Length 37.93 Kms
Road Project Image
7 / 10
BINA-KURWAI-SIRONJ (BOT), M.P. (TBTRL)

Location Bina-Kurwai-Sironj, Madhya Pradesh
Client MPRDC, Madhya Pradesh Government
Scope of work Two laning of Bina-Kurwal-Sironj
Cost of Project Rs 115.00 Cr.
Length 57 Kms
Road Project Image
8 / 10
NABHA PROJECT (BOT), PUNJAB

Location Nabha, Bhadson and Amloh, Punjab
Client Punjab Government
Scope of work Up-gradation, operation and maintenance of 55.427 Kms. road length (SH-12A) in the state of Punjab connecting NH-64 at Bhawanigarh and NH-1 at Gobindgarh.
Cost of Project Rs 92.00 Cr.
Length 37.93 Kms
Road Project Image
9 / 10
NABHA PROJECT (BOT), PUNJAB

Road Project Image
10 / 10
ROAD PROJECT IN NEPAL (PACKAGE – 3&5)

Name of Work Upgrading/Widening of Belahiya-Butwal Road to Six Lane Standards (Ch.9+000-12+000)
Client Government of Nepal, Ministry of Physical Infrastructure and Transport, Department of Roads
Cost of Project Rs 35.52 Cr. for Package 3 and Rs 29.63 Cr. for Package 5.
Scope of work Earthwork for formation construction and widening; bituminous works for pavement strengthening and construction; cement concrete pavement; drainage improvement; construction of bus lay bys and side walk, median and side barriers; traffic and road safety measures including road markings and signs, overhead traffic signs etc.
Status In Progress
Road Project Image
Pause